Project performance schedule
Date: 2013-07-06 23:09:25    Font: Big Middle Small    Browse: 2264

· With the domestic leading supersonic HVOF plasma, Plasma spray coatings, automatic  high power, the supersonic electric arc three spraying technology
· The United States, the United States PRAXAIR Seattle spraying Miller plasma equipment to undertake thermal spraying processing
 
Project performance schedule

Project performance schedule
Serial number user name project name date of the construction Material
1 xinhuisuangshui power plant in guangdong pot 480 T/H CFB with two water wall and economizer area of 400 M2 prevent grind spraying in July 2006, August SX-801
2 lianzhou power plant in guangdong water wall spray application three times 250 M2 in July 2006 SX-801
3 B plant sajiao guangdong power plant import unit boiler air preheater sealing surface supersonic spraying alloy in December 2001 SX-801
4 guangdong dongguan liwen paper mill plant with two CFB boiler water-cooled wall etc new furnace four tube spraying 800 M2 in October 2005 September 2006     SX88A
5  guangdong jiangmen the new thermal power Co., LTD pot has 450 T/H? CFB new furnace spraying water wall 70 square meters in December 2005 SX-601
6 guangdong dongguan jianhui paper Co., LTD.  Jackie pot of 220 T/H? CFB spraying water wall 60 square metre in February 2006 SX-601
7 chongqing tianfu power plant water wall (CFB) spraying 240 square meters in May 2006, SX-801
8 jinxi petrochemical coal-fired power station # 2 furnace water wall (CFB) spraying 180 square meters in May 2006, SX-801
9  erzhou power plant water wall (CFB) spraying 85 square meters in June 2006 SX-601
10 the ningbozhonmao power plant    # 3 in heating furnace (CFB) spraying 105 square meters in July 2006 SX-801
11 shandong xintai thermal power plant, the 1 # furnace economizer (CFB) spraying 206 square meters in July 2006 SX-801
12 Harbin huaneng power plant # 2 furnace water wall (CFB) spraying 115 square meters in August 2006 Sx-601
13  sichuan leshan haihong power plant 2 # furnace water wall (CFB) spraying 193 square meters   in September 2006 Sx-801
14 sichuan white horse CFB demonstration power plant water wall painting 71 square meters   in October 2006   Sx-601
15  ningxia coal group heat exchanger water wall painting 730 square meters in November 2006 Sx-601
16  jiangxi province coal auspicious to limited liability company above and water wall supersonic electric arc spraying 40 square meters in July 2006 LX88A